Building Committee Progress Report
It has been a little over 3 weeks since we confirmed our
intention with the Municipality of Anchorage to enter into an agreement to
install a fire sprinkler system within our facility so that we can continue
expanding our ministry here. Here are
some highlights of what the Building Committee has been working on since then:
The 45 day Administrative Site Plan review that
was going to be required by the MOA was waived after further research and help
from one of our members. This was very
helpful.
An asbuilt survey of the property was completed
so that we can close out the ADA ramp permit from 2000.
We have entered into an agreement with Chris
Cole and 61 North Architects to develop a floor plan for the Early Childhood
Education Program (aka preschool).
We have thoroughly reviewed the floor plan with
the ECE committee and have come to a consensus on the layout of the preschool
area.
We are just about complete with the documents
needed to submit for a building permit.
Andy Zanto and others have been clearing the
area of all belongings and have been removing items that can be removed.
We are still looking for that one person that
can take charge and lead the volunteers during our upcoming work days. Materials and overall direction will be
provided. Building Committee will still
participate and be the overall decision-making authority.
Excavation work will begin soon to repair the
sewer at the southeast corner of the building.
A required permit from AWWU will be purchased in order to perform this
work.
We have also entered into an agreement with a
civil engineer (Steve Pannone) to design the new water line and associated site
plans.
We are fairly close to selecting a sprinkler
contractor to work with us on designing the sprinkler installation. This will be the next phase, which will be
commencing this fall.
RSA Engineering has been diligently working on
the mechanical, plumbing, and electrical design drawings for the preschool
renovation project.
We are still in need of material gifts (i.e.
sheetrock, paint, flooring, cabinets, etc), service gifts (i.e. concrete
cutting, painting, flooring installation, electrical work, etc), volunteer
workday help, etc – see other blog posts for further information.
Subscribe to:
Posts (Atom)